Crane a break-in period of use and maintenance

1. Because the crane is a special vehicle, operating personnel should receive training from manufacturers, guidance, and a full understanding of the structure and performance of the machine and get some experience before they can operate the machine operation and maintenance. Product use and maintenance manual provided by the manufacturer, it is the operators operate equipment necessary information in front of the machine, be sure to read the use and maintenance manual, according to manufacturer's instructions for operation and maintenance.

2. Note the break-in period the workload, workload during the run-in period do not exceed the rated working load of 80%, and to arrange appropriate workload, preventing the machine from overheating caused by continuous operation for a long time.

3. Note always observe the gauge reading, an exception should be ruled out to stop, not found in reason, before the fault does not exclude, should cease operations.

4. Note always check the lubricating oil, hydraulic oil, coolant, brake fluid and fuel oil (water) and quality, and check the tightness of the machine. Check the oil found in missing too much, should analyse the reasons. Meanwhile, should strengthen the lubrication points lubrication is recommended during the break-in period, grease lubrication points are raised in each class (special requirements).

5. Keep the machine clean, adjust, tighten loose parts in case exacerbated by loose parts wear out or cause loss of parts.

6. End of the run-in period, the machine should be compulsory maintenance, inspection and adjustment of work, bearing in mind the replacement of the oil.

All in all, crane use and maintenance requirements during the break-in period, can be summarized as: emphasized on training, lighten the load, to checks, enhanced lubrication. Run-in period as long as attention and require the implementation of crane maintenance and repair, will reduce the occurrence of early failure, extended service life and improve operating efficiency, make the machine more benefit for you.